Taxonomy feed.
IEC 61850 interoperability testing is under way in Utrecht, where equipment and software from multiple suppliers are being integrated into common protection, automation and control applications. Participant reports now cover functional protection tests, network configuration from SCD files and virtualised protection.
Interoperability testing of substation configuration tools (SCT and ICT) has evolved from a supplementary element of the first IOP in 2011 to the central axis of the entire test programme by 2024. At IOP 2019, only 10 out of 159 ICD files (6.28%) passed validation without errors.
The UCA IUG conformance registry documents 1,650 test records across three IEC 61850 editions. To read the numbers, you need to know the policy behind them: who sets the transition deadlines, when Edition 2-only testing ended, and why 2023 produced a record spike. This article traces the process.