Taxonomy feed.
Conventional CTs hardwired to two multifunction IEDs per 132 kV bay from different manufacturers, GOOSE in place of interlock wiring, a virtualized SCMS, and a standard drawing set that ships with every tender. The design has now supported the construction of 90 substations in Dubai.
Interoperability testing of substation configuration tools (SCT and ICT) has evolved from a supplementary element of the first IOP in 2011 to the central axis of the entire test programme by 2024. At IOP 2019, only 10 out of 159 ICD files (6.28%) passed validation without errors.
8 out of 10 configurators fail to fully recognize SCD files. We analyze the confRev attribute in GOOSE and SV: what happens when the value does not match the expected one, and how this nearly derailed the commissioning of a real project with 43 IEDs.
XML Schema validation checks structure — it cannot verify that a GOOSE subscription references a valid dataset or that a logical node contains required data objects. Object Constraint Language (OCL) fills that gap. IEC TS 61850-6-3, published in 2025, defines how OCL rules should be written and applied to IEC 61850 XML files, laying the groundwork for consistent, formal SCL validation across tools.