Digital Substation

Relay protection, SCADA, Metering, and Cybersecurity for electrical infrastructure.

Latest Articles

Latest engineering publications on IEC 61850, digital substations, PRP/HSR, and IEEE 1588 (PTPv2).

UCA International Users Group Opens Registration for 61850 IOP 2026

UCA International Users Group has opened registration for 61850 IOP 2026, the annual interoperability testing event for IEC 61850 equipment and software tools. For the first time, the programme includes multi-vendor MPLS network testing and functional verification based on Basic Application Profiles (BAP) per IEC 61850-7-6 Ed.2 and IEC 61850-90-30:2025.

confRev: How Configuration Revisions Can Ruin Communications

8 out of 10 configurators fail to fully recognize SCD files. We analyze the confRev attribute in GOOSE and SV: what happens when the value does not match the expected one, and how this nearly derailed the commissioning of a real project with 43 IEDs.

Top-Down IEC 61850 Engineering: The Five-Step Process, Explained

Top-down IEC 61850 engineering — formalized in TR IEC 61850-90-30:2025 and TR IEC 61850-7-6 (Ed. 2) — moves specification errors from commissioning to the design phase, before a single IED is selected or procured. This article explains the mechanics of the five-step process: what each step produces, what files are exchanged, and why the sequence achieves outcomes the conventional bottom-up approach cannot.

Explore Taxonomies