Digital Substation

Relay protection, SCADA, Metering, and Cybersecurity for electrical infrastructure.

Latest Articles

Latest engineering publications on IEC 61850, digital substations, PRP/HSR, and IEEE 1588 (PTPv2).

confRev: How Configuration Revisions Can Ruin Communications

8 out of 10 configurators fail to fully recognize SCD files. We analyze the confRev attribute in GOOSE and SV: what happens when the value does not match the expected one, and how this nearly derailed the commissioning of a real project with 43 IEDs.

Top-Down IEC 61850 Engineering: The Five-Step Process, Explained

Top-down IEC 61850 engineering — formalized in TR IEC 61850-90-30:2025 and TR IEC 61850-7-6 (Ed. 2) — moves specification errors from commissioning to the design phase, before a single IED is selected or procured. This article explains the mechanics of the five-step process: what each step produces, what files are exchanged, and why the sequence achieves outcomes the conventional bottom-up approach cannot.

OCL in IEC 61850: Machine-Readable Rules for SCL Validation

XML Schema validation checks structure — it cannot verify that a GOOSE subscription references a valid dataset or that a logical node contains required data objects. Object Constraint Language (OCL) fills that gap. IEC TS 61850-6-3, published in 2025, defines how OCL rules should be written and applied to IEC 61850 XML files, laying the groundwork for consistent, formal SCL validation across tools.

Cuba's National Grid Collapses Again: A Technical Analysis

On March 16, 2026, Cuba experienced its eighth major blackout in 25 months — and its second total grid collapse of March alone. The Ministry reported that no faults were detected in operating units at the time of collapse, pointing to a structural cascading failure driven by chronic generation deficit.