Topic feed.
One click in Tekvel Magic software — and you have a MS Word protocol that covers every IED on the substation: a summary of all URCB/BRCB control blocks with their MMS reference, type, RptEna state, Owner client, triggers, optional fields, DataSet reference, BufTm and IntgPd; plus a detailed section decoding the bit fields and the element-by-element composition of every DataSet — with descriptions taken from the SCL file. The case closes the second half of the SCADA acceptance questions: «how it is configured» is now complemented by «how it is actually working right now», and you instantly see whether reports are sitting idle while SCADA collects data by periodic polling.
A contractor hands over an SCD file claiming it matches the actual device configuration. But how do you verify that quickly and provably when there are 76 IEDs on site and no permanent monitoring system? A field case from Tekvel: the verification module in the Tekvel Magic software automatically compared the device configurations against the SCD and produced an engineering deviation report covering DataSets, GOOSE, Sampled Values and MMS reports in 15 minutes.
Can DANEO 400 from Omicron electronics be effectively used at commissioning and maintenance stages as the only IEC 61850 instrument?
Recently we have received binary signals input/output module by Siemens - SICAM IO UNIT 7XV5673. This device is absolutely new: as binary inputs/outputs expansion module it was presented last fall and, regarding to Siemens office, we were one of the first to try it out.
TEKVEL company presented a free beta version of JAVA-based IEC 61850-9-2LE software simulator. Digital Substation immediately downloaded the application and offers an express overview of the proposed software.