Digital Substation

Digital Substation is an engineering publication focused on IEC 61850 automation, protection systems, and digital grid intelligence.

Latest Articles

Latest engineering publications on IEC 61850, digital substations, PRP/HSR, and IEEE 1588 (PTPv2).

IEC 61850 Europe 2017

The 4th Annual IEC 61850 Europe 2017 takes place 26-28 September 2017 in Amsterdam, The Netherlands, with 14+ end-user case-studies from Europe, USA, India & China.

ExpoForum to host a major event in the fuel-and-energy sector

We are happy to invite you to the 5th Russian International Energy Forum that will take place on 25 - 28 April. The specialized exhibition ENERGETIKA & ELEKTROTECHNIKA (Power and Electrical Engineering) will be held as part of the Forum and showcase innovative solutions in the energy market.

EDF cooperates with South African power grid

Eskom and Électricité de France (EDF) today signed a Memorandum of Understanding (MoU) to extend peer cooperation in the fields of transmission and distribution of electricity.

IEC TC 57 and WG 10 in Figures

IEC TC 57 Working Group 10 "Power system IED communication and associated data models" met last week in Geneva (Switzerland) at the IEC central office. Mr. Charles Jacquemart (IEC Technical Officer) presented some very interesting figures about the TC 57 and especially WG 10. The following slides are published here with the permission of Mr. Jacquemart.

Solar road pilot is built in rural Georgia

The first Wattway solar road pilot in America has popped up in rural west Georgia. The Ray C. Anderson Foundation, named for sustainable manufacturing pioneer Ray Anderson, is testing renewable technologies along an 18-mile stretch of road, and recently installed 538 square feet of Colas‘ Wattway solar road system near the border between Georgia and Alabama.

India to Build Longest 800kV UHVDC Transmission Line

ABB has teamed up with India’s national electricity grid operator Power Grid Corporation of India Limited (POWERGRID) in a mega project worth over $640 million for ABB to deliver a transmission link that will have the capacity to bring reliable electricity to more than 80 million people. The Raigarh-Pugalur 800 kilovolt (kV) ultra-high-voltage direct current (UHVDC) system will connect Raigarh in Central India to Pugalur in the southern state of Tamil Nadu.

Explore Taxonomies