IEC 61850 Europe Conference, Exhibition & Networking Forum
The 3rd Annual IEC 61850 Europe 2016 conference, exhibition and networking forum held in Amsterdam drew together 150+ IEC 61850 experts and decision makers from across the European utility sector.
The 3rd Annual IEC 61850 Europe 2016 conference, exhibition and networking forum held in Amsterdam drew together 150+ IEC 61850 experts and decision makers from across the European utility sector.
Cybersecurity: what are the adequate boundaries for protection?
“Brain storm” is a collection of industry experts' opinions on actual problems. It allows specialists to look at different problems at different angles.
“Brain storm” is a collection of industry experts' opinions on actual problems. It allows specialists to look at different problems at different angles.
Hands-on DANEO 400 in real digital substation
Can DANEO 400 from Omicron electronics be effectively used at commissioning and maintenance stages as the only IEC 61850 instrument?
Can DANEO 400 from Omicron electronics be effectively used at commissioning and maintenance stages as the only IEC 61850 instrument?
Network infrastructure in digital substations
A local area network is critical infrastructure in a digital substation. Experts in the area of relay protection and automatic as well as automated process control systems run into it with increasing frequency, while the number of questions such as, ‘How to design it?’, ‘How to maintain it?’, ‘How to evaluate its security and effectiveness?’ only increases.
A local area network is critical infrastructure in a digital substation. Experts in the area of relay protection and automatic as well as automated process control systems run into it with increasing...
Fault recording in digital substations
Using which IEC 61850 services fault recorders in digital substations must acquire data? How the architecture of fault recording systems must change in digital substation? Experts talk.
Using which IEC 61850 services fault recorders in digital substations must acquire data? How the architecture of fault recording systems must change in digital substation? Experts talk.

Digital Substation

(close)

 

Digital Substation

(close)

Your usename must be at least 4 characters long

Your email must be valid

Your password must be at least 6 characters long